The 4-Hour Risk-Free, Hassle-Free OS400 Migration/Version Upgrade Anywhere In The US.
We Can Upgrade Your IBM Power i (iSeries) With V6R1 or V7R1 From Your Current Server And OS400 Version In About 2-3 Times Your Complete System Save Time.
That’s About 2-4 Hours Depending How Much Data You Have.
We Can Do This Wherever You Are In The USA.
Because We Have Already Done It So Many Times All Over North America.
Perhaps you’re wondering, “How the heck is that possible? A version upgrade or moving to a new server generally takes a weekend.”
Simple Answer: We do all the hard work offsite at our tech center so the amount of your server’s downtime is negligible – about 4 hours or less.
Here’s how it works.
First Send Us A Complete Backup.
You send us a complete Option 21 save tape. We restore your backup onto one of our servers. We have a portfolio of tape drives, so we can read most any format you send us.
We Also Test Your Backup Recovery Plan – An Added Bonus.
During the restore process as an added bonus we are also testing your backup up process. You might be surprised to know that many of our clients have never completely tested their backups for a complete restore and probably wonder if they could truly recover from a disaster using their full system save and daily backup strategy. They are terrified of putting it to the test in a “fire drill” that somehow goes awry, yet always worried that an undiscovered glitch might prevent recovery in the event of a real disaster. We have heard IBM charges between $1500-$2000 to test and validate your backup.
We Migrate You To Your Preferred OS400 Version – Offsite.
Once restored, we start the migration process to move your environment to V6R1 or V7R1.
This process takes us just as long as if we were onsite – about 20 hours, plus or minus 5 hours, depending on a variety of factors. If you are 4-6 releases behind, this process can take way longer. And that’s assuming everything goes according to plan.
But because we are not onsite, your production is not impacted. For companies that run 2-3 shifts, even on weekends, this is a big plus.
Even if you don’t run 2-3 shifts on weekends, it means your weekend will not be tied up with a conversion and set up. No more grueling, sleepless weekends.
You Test Remotely While Your Current Server Continues Production.
Once we have completed the version upgrade process, you dial into our server via VPN to start testing your “new system.” Test as long as you like. Most clients complete their testing between 2 to 4 weeks. When you are satisfied with the testing, we schedule to onsite set up and cutover.
Our Scheduled Onsite Migration Is About 4 Hours – Time To Set Up Your Server, Test, And Restore From Your Last Backup
We ship in your system. We set up new system up and making sure everything is running OK. You give us the most recent backup of changed objects since the Option 21 save to we can bring your data current.
We Have Provided Our Clients All Over The Country A Safe, Smooth Migration With Our 4-Hour Version Upgrade
We have provided IBM users with our 4-hour Version Upgrade all over the USA – we don’t need to be local to do a great job for you. We have done all the testing and flushed out all the surprises before we even come to your location to install your new server.
Here’s What Our Clients Say About Our 4-Hour Version Upgrade:
“Source Data Products Made The Transition From The 9406-520 To The New 8203-E4A Seamless”
“What I really liked is after we ordered the IBM Power I server, it shipped to SDP’s Data Center where their techs preloaded my system. So when my server came on site, we had everything set up in about 4 hours on a Sunday. This is a really big deal!”
“On Monday, the users were thrilled with the performance improvement. In a following manager’s meeting, I received congratulations on a job well done and a round of applause. That’s great, too.”
“In the past I hired IBM to do our upgrade. IBM would come onsite for the whole weekend. They would back everything up, do the install, restore it all, and test everything. Of course, there are always bumps along the upgrade road. It was a huge and time-consuming undertaking. And, everything at IBM rates.”
“I gladly recommend the SDP 4-Hour Version Upgrade.”
Kathleen Creamer, MIS Manager Hi-Temp Insulation, Inc.
“We Were Back Up In 2 Hours.”
“Your tech Mark took the drives put of our test Power 5 server with our complete system upgraded to V7R1 and swapped them in our production 9406-520. He then restored the data from our backup done the night before. We were back up after 2 hours. Very, very, very cool.”
Pam Tucker, IT Consultant and Judy Fisher, Mytel’s Controller
“There Was No Downtime.”
“Your Power i tech Matt said your High Availability solution could replicate our Retalix system from our 9406-800 on V5R3 to our new 9406-520 with V5R4 without the need for a complete backup or downtime. This way, we just role-swapped production from the 9406-800 to the 9406-520. There was no downtime. We saved 20 hours.”
Armand Page, VP of Operations and IT, Jake’s Finer Foods
“Source Data Delivered Our Power 6 With Our System Upgraded to V6R1 And Ready To Go.”
“We worked closely with Source Data to develop a migration plan to ship the 8203-E4A POWER 6 servers to SDP’s technology center for the initial migration and testing of all of the applications in V6R1. A traditional version upgrade and migration generally takes 18 to 30 hours. By shipping the servers to SDP, our production and test environment would not be impacted by this one-time migration.”
Betsy Hobson, Garratt-Callahan’s ERP Consultant
“My Migration From Our 9406-820 To Our New 9406-525 Took Less Than 4 Hours”
“I gave a complete copy of my system to Source Data. At their tech center, Source Data upgraded it from V5R2 to V5R4 and loaded it on our new 9406-525. When our new Power 5 arrived onsite, our migration from our 9406-820 to our new 9406-525 took less than 4 hours.”
Richard Givens, Director of Information Technology, Apex Bulk Logistics, LLC.

“I Got The Easiest Migration In My IT Career”
“Not only was our migration less expensive with Source Data Products, it was the easiest migration in my IT career. What really made the difference was the approach that Source Data takes to migrate the system. We gave them a complete backup and they did all the work offsite. Our production continued to operate and we tested our new system remotely until we were ready to bring it onsite.
“I have migrated from a System/38 to 9406-D40, to a 9406-300, to a 9406-500 and to a 9406-720 before our 9406-820. I have had marathons where I was up all weekend praying the migration went well. This migration from our 9406-820 to our new IBM Power 7 felt about as close to turn-key as possible.”
Harold Schlaifer, Chief Operating Officer, The Screening Pros
Let Me Summarize The Benefits Of The 4-Hour Version Upgrade
1) This approach does not require 1 or more weekends of downtime to upgrade OS400 to the latest release. Restricted downtime is dramatically limited – in most cases, it’s about 2x – 3x your save time depending on the amount of data, or about 2 to 4 hours for most of our clients.
2) The unexpected surprises are discovered before anyone comes onsite to go live. If we did not encounter them in our planning, we either find them in the upgrade process or during your test when you VPN to your system to test the upgrade.
3) When we plan the go live cutover, all the testing has been completed. There should be no risk of surprise and the set up and go live is a smooth, hassle-free experience.
4) If, for any reason, the client needs or wants to go back to the version prior to the upgrade, the system can be returned to its prior state in an hour. This roll-back capability makes this upgrade approach risk-free.
5) You SAVE BIG because we can do most of the work at our tech center instead of onsite. While we know our competition charges as much as $6,000 to $20,000+ for version upgrades, we charge a fraction of this price for our version upgrade.
To learn how our 4-Hour Risk-Free, Hassle-Free OS400 Version Upgrade and it can save you time, frustrations, and money, call me at 800-333-2669 x 204 or email me at blosey@source-data.com.






"We Figure Source Data Products Has Helped Us Save Over $3 Million In The Last 10 Years We Have Worked Together. Now, Over 80% Of Our Business Comes Over The Web. Source Data Even Uncovered A Bad Lease From Previous IT Supplier – And Helps Us Recoup Over $20,000."
When we have an issue, we get the answer from Source Data with the first call.
"We are happy, happy, happy. SDP’s document imaging solution more than paid for itself. We got our money back in less than 3 months. We figure we are saving $200,000 or more every year. We’re no longer mailing or printing. We don’t have people pushing paper. Bills go out faster and correct. No more postage. No more filing or lost documents. Our customers have more confidence with our billings."
"As I think about it, Source Data Products provided me with a real 'wow' experience with the AS400 High Availability solution they installed. Hearing the problems of the other HA users in Rochester really blew me away because we have none of them. I gladly recommend SDP to others whenever I can."